[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143344":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143344,799,2,"多选题","某工程质量事故发生后，对该事故进行调查，经过原因分析判定该事故不需要处理，其后续工作有()。（2013）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","补充调查",false,{"key":16,"text":17,"correct":14},"B","B检查验收",{"key":19,"text":20,"correct":21},"C","C做出结论",true,{"key":23,"text":24,"correct":21},"D","D提交处理报告",{"key":26,"text":27,"correct":14},"E","E实施防护措施","CD","",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]