[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143191":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1143191,799,2,"多选题","（2019年真题）施工质量管理的PDCA循环中，检查C（check）包括（）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","监理单位的平行检查",false,{"key":16,"text":17,"correct":18},"B","作业者的自检",true,{"key":20,"text":21,"correct":18},"C","作业者的互检",{"key":23,"text":24,"correct":14},"D","政府部门的监督检查",{"key":26,"text":27,"correct":18},"E","专职管理者的专检","BCE","P159-160 检查C (Check)：指对计划实施过程进行各种检查，包括作业者的自检、互检和专职管理者专检。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]