[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1143136":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1143136,799,1,"单选题","在工程勘察设计、招标采购、施工安装、竣工验收等各个阶转，建设工程项目参与各方的质量控制，均应围绕致力于满足( )的质量总目标而展开。（2013）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","法律法规",false,{"key":16,"text":17,"correct":18},"B","业主要求",true,{"key":20,"text":21,"correct":14},"C","工程建设标准",{"key":23,"text":24,"correct":14},"D","设计文件","工程项目质量控制，就是在项目实施整个过程中，包括项目的勘察设计、招标采购、施工安装、竣工验收等各个阶段，项目参与各方致力于实现业主要求的项目质量总目标的一系列活动。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]