[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142918":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142918,799,2,"多选题","某工程网络计划中，工作N的自由时差为5天，计划执行过程中检查发现，工作N的工作时间延后了3天，其他工作均正常，此时（ ）。2017",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工作N的总时差不变，自由时差减少3天",false,{"key":16,"text":17,"correct":18},"B","总工期不会延长",true,{"key":20,"text":21,"correct":18},"C","工作N的总时差减少3天",{"key":23,"text":24,"correct":18},"D","工作N的最早完成时间推迟3天",{"key":26,"text":27,"correct":14},"E","工作N将会影响紧后工作","BCD","本题考查的是双代号网络计划时间参数的计算。N工作拖延3天，其自由时差是5天，所以并不影响总工期，所以选项B正确；N工作的总时差等于其自由时差加上紧后工作总时差的最小值，其他工作正常，自由时差减少了3天，所以总时差减少3天，因此选项C正确；因为N工作拖延了3天完成，因此最早完成时间推迟了3天，所以选项D正确。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]