[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142846":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142846,799,2,"多选题","下列指标中，属于项目部施工成本考核的有（ ）。 （2015）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","施工成本降低额",true,{"key":16,"text":17,"correct":14},"B","施工成本降低率",{"key":19,"text":20,"correct":21},"C","施工生产总成本",false,{"key":23,"text":24,"correct":21},"D","劳动力不均衡系数",{"key":26,"text":27,"correct":21},"E","生产能力利用率","AB","施工成本考核以施工成本降低额和施工成本降低率作为成本考核的主要指标。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]