[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142835":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1142835,799,1,"单选题","（2019年真题）某施工单位为订立某工程项目建造合同共发生差旅费、投标费50万元。该项目工程完工时共发生人工费600万元,差旅费5万元,管理人员工资98万元,材料采购及保管费15万元,根据《企业会计准则第15号-建造合同),间接费用是( )万元。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","50",false,{"key":16,"text":17,"correct":18},"B","103",true,{"key":20,"text":21,"correct":14},"C","55",{"key":23,"text":24,"correct":14},"D","70","P101-102 间接费用是企业下属的施工单位或生产单位为组织和管理施工生产活动所发生的费用。5+98=103万元。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]