[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142776":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142776,799,2,"多选题","（2020年真题）施工项目竞争性成本计划是（ ）的估算成本计划。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","选派项目经理阶段",false,{"key":16,"text":17,"correct":18},"B","投标阶段",true,{"key":20,"text":21,"correct":14},"C","施工准备阶段",{"key":23,"text":24,"correct":18},"D","签订合同阶段",{"key":26,"text":27,"correct":14},"E","制定企业年度计划阶段","BD","P74-78 竞争性成本计划是施工项目投标及签订合同阶段的估算成本计划。 竞争性成本计划带有成本战略的性质，是施工项目投标阶段商务标书的基础。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]