[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142755":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142755,799,2,"多选题","施工成本计划的编制方式有（ ）。2017",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","按施工进度编制施工成本计划",true,{"key":16,"text":17,"correct":14},"B","按施工成本组成编制施工成本计划",{"key":19,"text":20,"correct":21},"C","按施工质量编制施工成本计划",false,{"key":23,"text":24,"correct":21},"D","按施工合同编制施工成本计划",{"key":26,"text":27,"correct":14},"E","按施工项目组成编制施工成本计划","ABE","本题考查的是按施工成本组成编制施工成本计划的方法。施工成本计划的编制方式有：（1）按施工成本组成编制施工成本计划；（2）按施工项目组成编制施工成本计划；（3）按施工进度编制施工成本计划。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]