[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142737":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1142737,799,1,"单选题","根据《建设工程委托监理合同(示范文本)》(GF―2000―0201)，监理人发现工程设计不符合国家规定的质量标准时，正确的做法是( )。（2012）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","指令施工单位征求设计人的修改意见",false,{"key":16,"text":17,"correct":14},"B","及时向设计人报告问题的具体情况",{"key":19,"text":20,"correct":14},"C","口头联系设计人并书面报告委托人",{"key":22,"text":23,"correct":24},"D","书面报告委托人并要求设计人更正",true,"工程监理人员认为工程施工不符合工程设计要求、施工技术标准和合同约定的，有权要求建筑施工企业改正。工程监理人员发现工程设计不符合建筑工程质量标准或者合同约定的质量要求的，应当报告建设单位要求设计单位改正。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]