[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142731":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1142731,799,1,"单选题","根据《建设工程监理规范》(GB 50319-2000)，属于施工阶段监理工作任务的是( )。（2012）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","检查施工单位专职安全生产管理人员的资格",false,{"key":16,"text":17,"correct":18},"B","检查施工单位的测量、检测仪器设备定期检验的证明文件",true,{"key":20,"text":21,"correct":14},"C","审核分包单位资质条件",{"key":23,"text":24,"correct":14},"D","查验施工单位的施工测量定位放线成果","施工阶段的主要任务包括施工阶段的质量控制、进度控制、投资控制和安全生产管理。选项A．C．D属于施工准备阶段建设监理工作的主要任务。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]