[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142719":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1142719,799,1,"单选题","根据《建设工程项目管理规范》GB\u002FT50326-2006条文风险等级划分，下图中风险区A的风险等级为（ ）。2017",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","4",{"key":19,"text":20,"correct":14},"C","3",{"key":22,"text":23,"correct":24},"D","5",true,"@##",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]