[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142698":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1142698,799,1,"单选题","根据《国务院关于取消第二批行政审批项目和改变一批行政审批项目管理方式的决定》(国发[2003]5号)，取得建造师注册证书的人员是否担任工程项目施工的项目经理，由( )决定。（2012）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建筑施工企业",true,{"key":16,"text":17,"correct":18},"B","建设主管部门",false,{"key":20,"text":21,"correct":18},"C","项目业主",{"key":23,"text":24,"correct":18},"D","项目监理单位","大、中型工程项目施工的项目经理必须由取得建造师注册证书的人员担任;但取得建造师注册证书的人员是否担任工程项目施工的项目经理，由企业自主决定。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]