[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142634":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142634,799,2,"多选题","在国际上，工程建设物资采购的常用模式有( )。（2012）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","业主方自行采购",true,{"key":16,"text":17,"correct":14},"B","承包商采购",{"key":19,"text":20,"correct":21},"C","行政制定采购",false,{"key":23,"text":24,"correct":21},"D","行业协会统一采购",{"key":26,"text":27,"correct":14},"E","与承包商约定指定供应商采购","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]