[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142607":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1142607,799,1,"单选题","下列建设工程项目决策阶段的工作内容中，属于组织策划的是( )。（2013）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","业主方项目管理的组织结构",false,{"key":16,"text":17,"correct":14},"B","生产运营期经营管理总体方案",{"key":19,"text":20,"correct":14},"C","编码体系的建立",{"key":22,"text":23,"correct":24},"D","实施期组织总体方案",true,"组织策划其主要工作内容包括： ( 1 ) 决策期的组织结构； ( 2 ) 决策期任务分工； ( 3 ) 决策期管理职能分工； ( 4 ) 决策期工作流程； ( 5 ) 实施期组织总体方案； ( 6 ) 项目编码体系分析。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]