[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142517":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142517,799,2,"多选题","信息编码是信息处理的一项重要基础工作，施工单位在进行建设工程项目成本项编码时，应综合考虑的因素包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","工程款支付",true,{"key":16,"text":17,"correct":14},"B","标底价",{"key":19,"text":20,"correct":21},"C","施工成本分析",false,{"key":23,"text":24,"correct":21},"D","投标价",{"key":26,"text":27,"correct":14},"E","合同价","ABE","本题主要考查服务于各种用途的信息编码。 项目的投资项编码（业主方）\u002F成本项编码（施工方），并不是概预算定额确定的分部分项工程的编码，应综合考虑概算、预算、标底、合同价和工程款的支付因素，建立统一的编码，服务于项目投资目标的动态控制。 综上所述，本题正确答案为ABE。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]