[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142362":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1142362,799,1,"单选题","业主在向中标人授标前，要求中标人对施工方案进行修改，由此引起的费用增加由（ ）承担。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","监理人",false,{"key":16,"text":17,"correct":14},"B","招标人",{"key":19,"text":20,"correct":21},"C","中标人",true,{"key":23,"text":24,"correct":14},"D","业主","@jin",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]