[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142262":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1142262,799,1,"单选题","（2020年真题）某按单价合同进行计价的招标工程，在评标过程中发现某投标人的总价与单价的计算结果不一致，原因是投标人在计算时将钢材单价4000元\u002F吨误作为2000元\u002F吨。对此，业主有权（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","以总价为准调整单价",false,{"key":16,"text":17,"correct":18},"B","以单价为准调整总价",true,{"key":20,"text":21,"correct":14},"C","要求投标人重新提交钢材单价",{"key":23,"text":24,"correct":14},"D","将该投标文件作废标处理","P293-294 单价合同的特点是单价优先。对于投标书中明显的数字计算错误，业主有权利先作修改再评标，当总价和单价的计算结果不一致时，以单价为准调整总价。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]