[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142178":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1142178,799,2,"多选题","根据物资采购合同的规定，交货日期的确定可以按照（ ）方式。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","供货方负责送货的，以采购方收货戳记的日期为准",true,{"key":16,"text":17,"correct":18},"B","凡委托运输部门或单位运输、送货或代运的产品，一般以向承运单位提出申请的日期为准",false,{"key":20,"text":21,"correct":14},"C","凡委托运输部门或单位运输、送货或代运的产品，一般以供货方发运产品时承运单位签发的日期为准",{"key":23,"text":24,"correct":14},"D","采购方提货的，以供货方按合同规定通知的提货日期为准",{"key":26,"text":27,"correct":18},"E","供货方负责送货的，以供货方发出日期为准","ACD","本题主要考查交货日期。 交货日期的确定可以按照下列方式：（1）供方负责送货的，以采购方收货戳记的日期为准；（2）需采购方提货的，以供方按合同规定通知的提货日期为准；（3）凡委托运输部门或单位运输、送货或代运的产品，一般以供方发运产品时承运单位签发的日期为准。 综上所述，本题正确选项为ACD项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]