[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1142126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1142126,799,1,"单选题","根据《建设工程施工合同（示范文本）》（GF-99-0201），“以书面形式提供有关水文地质勘探资料和地下管线资料，提供现场测量基准点，基准线和水准点有关资料，并进行现场交验”是（ ）的责任和义务。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发包人",true,{"key":16,"text":17,"correct":18},"B","设计单位",false,{"key":20,"text":21,"correct":18},"C","承包人",{"key":23,"text":24,"correct":18},"D","监理人","本题主要考查发包人的责任与义务。 根据《建设工程施工合同（示范文本）》（GF-1999-0201）规定的发包人的责任与义务，提供有关水文地质勘探资料和地下管线资料，提供现场测量基准点、基准线和水准点及有关资料，以书面形式交给承包人，并进行现场交验，提供图纸等其他与合同工程有关的资料。 综上所述，本题正确选项为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]