[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141757":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141757,799,1,"单选题","某建设工程发生一起质量事故，经调查分析是由于“边勘察、边设计、边施工”导致的。2014则引起这起事故的主要原因是（ ）。2014",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","社会、经济原因",true,{"key":16,"text":17,"correct":18},"B","技术原因",false,{"key":20,"text":21,"correct":18},"C","管理原因",{"key":23,"text":24,"correct":18},"D","人为事故和自然灾害原因","本题考查的是施工质量事故发生的原因。社会、经济原因：指引发的质量事故是由于社会上存在的不正之风及经济上的原因，滋长了建设中的违法违规行为，而导致出现质量事故。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]