[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141713":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1141713,799,2,"多选题","建设单位收到施工承包单位的单位工程验收申请后，应组织（ ）等方面人员进行验收，并形成验收报告。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工单位",true,{"key":16,"text":17,"correct":18},"B","检测单位",false,{"key":20,"text":21,"correct":14},"C","设计单位",{"key":23,"text":24,"correct":14},"D","监理单位",{"key":26,"text":27,"correct":14},"E","质量监督机构","ACDE","本题主要考查竣工验收的主体。 建设单位收到施工承包单位工程验收申请后，应组织施工单位、勘察单位、设计单位、监理单位、政府监督机构等方面人员进行验收，并形成验收报告。 综上所述，本题正确答案为ACDE。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]