[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141670":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1141670,799,2,"多选题","设计单位在建设工程项目施工阶段进行质量控制和验收的主要工作内容包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","控制原材料、半成品质量",false,{"key":16,"text":17,"correct":14},"B","参与审核主体结构的施工方案",{"key":19,"text":20,"correct":21},"C","对变更设计图纸进行控制",true,{"key":23,"text":24,"correct":21},"D","纠正施工中发现的设计问题",{"key":26,"text":27,"correct":14},"E","完善工程竣工图","CD","本题主要考查设计单位质量控制和验收的工作。 设计单位在施工阶段，通过（1）对关键部位和重要分部分项工程施工质量验收签证（2）设计变更控制（3）纠正施工中发现的设计问题（4）采纳变更设计的合理化建议等工作，保证竣工项目的各项施工成果与设计文件（包括变更文件）所规定的质量标准相一致。 综上所述，本题正确选项是CD项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]