[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141666":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141666,799,1,"单选题","某工程由于安装的生产设备存在质量缺陷，导致其中某分部工程质量不合格，施工单位在更换了该生产设备后，该分部工程应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按验收程序，重新组织检查验收",true,{"key":16,"text":17,"correct":18},"B","经有资质的检测单位检测鉴定后，予以验收",false,{"key":20,"text":21,"correct":18},"C","征得建设单位同意后，可予以验收",{"key":23,"text":24,"correct":18},"D","按技术处理方案和协商文件，进行验收","本题考核的是建筑工程施工质量的验收。 按照《建筑工程施工质量验收统一标准》（GB50300—2001）的规定：在检验批验收时，对严重的缺陷应当推倒重来，一般的缺陷通过翻修或更换器具、设备予以解决后重新进行验收。 综上所述，本题正确答案为A。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]