[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141637":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141637,799,1,"单选题","对于地基基础设计等级为甲级或地质条件复杂，成桩质量可靠性低的灌注桩，应采用（ ）的方法进行检验。检验桩数不应少于总数的1%，且不少于3根。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","静载荷试验",true,{"key":16,"text":17,"correct":18},"B","实际测量法",false,{"key":20,"text":21,"correct":18},"C","低应变法",{"key":23,"text":24,"correct":18},"D","高应变法","本题主要考查地基基础检验。 《地基设计规范》第10.1.8条规定：“施工完成后的工程桩应进行竖向承载力检验。竖向承载力检验的方法和数量可根据地基基础设计等级和现场条件，结合当地可靠的经验和技术确定。复杂地质条件下的工程桩竖向承载力的检验宜采用静载荷试验，检验桩数不得少于同条件下总桩数的1%，且不得少于3根。大直径嵌岩桩的承载力可根据终孔时桩端持力层岩性报告结合桩身质量检验报告核验。” 综上所述，本题正确答案为A。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]