[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141475":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1141475,799,1,"单选题","建立工程项目质量控制系统时，确定质量责任静态界面的依据是法律法规、合同条件和（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设计与施工单位间的责任划分",false,{"key":16,"text":17,"correct":14},"B","质量管理的资源配置",{"key":19,"text":20,"correct":21},"C","组织内部职能分工",true,{"key":23,"text":24,"correct":14},"D","质量控制协调制度","本题主要考查建设工程项目质量控制体系的建立。 建设工程项目质量控制系统的质量责任界面，包括静态界面和动态界面。静态界面根据法律法规、合同条件、组织内部职能分工来确定。动态界面是指项目实施过程设计单位之间、施工单位之间、设计与施工单位之间的衔接配合关系及其责任划分，必须通过分析研究，确定管理原则与协调方式。 综上所述，本题正确答案为C。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]