[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141453,799,1,"单选题","根据《质量管理体系基础和术语》（GB\u002F19000-2008\u002FISO9000:2005），质量控制的定义是（ ）。2014",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量管理的一部分，致力于满足质量要求的一系列相关活动",true,{"key":16,"text":17,"correct":18},"B","工程建设参与者为了保证工作项目质量所从事工作的水平和完善程度",false,{"key":20,"text":21,"correct":18},"C","对建筑产品具备的满足规定要求能力的程度所作的系统检查",{"key":23,"text":24,"correct":18},"D","未达到工程项目质量要求所采取的作业技术和活动","质量控制是质量管理的一部分，是致力于满足质量要求的一系列相关活动。参见教材59。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]