[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141428":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1141428,799,2,"多选题","建设工程项目质量的影响因素主要是指在建设工程项目质量目标策划决策和实现过程中各种客观因素和主观因素，包括人的因素、（）等。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","技术因素",true,{"key":16,"text":17,"correct":18},"B","组织因素",false,{"key":20,"text":21,"correct":14},"C","管理因素",{"key":23,"text":24,"correct":14},"D","环境因素",{"key":26,"text":27,"correct":14},"E","社会因素","ACDE","本题考核的是建设工程项目质量的影响因素。 建设工程项目质量的影响因素，主要是指在建设工程项目质量目标策划、决策和实现过程的各种客观因素和主观因素，包括人的因素、技术因素、管理因素、环境因素和社会因素等。组织因素应属于管理因素。 综上所述，正确选项为ACDE。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]