[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141370":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1141370,799,1,"单选题","下列各项措施中，（ ）是建设工程项目进度控制的技术措施。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","确定各类进度计划的审批程序",false,{"key":16,"text":17,"correct":14},"B","选择工程承发包模式",{"key":19,"text":20,"correct":21},"C","优选项目设计、施工方案",true,{"key":23,"text":24,"correct":14},"D","选择合理的合同结构","本题主要考查项目进度控制措施。 C项：优选工程项目施工方案属于设计技术和施工技术的选用，其目的是为了加快施工进度或者节约投资。故C项正确。 A项：A项属于组织措施，故A错误。 BD项： BD项属于管理措施，故BD错误。 综上所述，本题正确答案为C。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]