[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141199":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141199,799,1,"单选题","下列建设工程项目总进度目标论证的工作中，属于项目结构分析的是（ ）。2017",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","将项目进行逐层分解",true,{"key":16,"text":17,"correct":18},"B","了解和调查项目的总体部署",false,{"key":20,"text":21,"correct":18},"C","对每一个工作项进行编码",{"key":23,"text":24,"correct":18},"D","调查项目实施的主客观条件","本题考查的是项目总进度目标论证的工作步骤。大型建设工程项目的结构分析是根据编制总进度纲要的需要，将整个项目进行逐层分解，并确立相应的工作目录。参见教材25。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]