[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141198":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1141198,799,1,"单选题","关于建设工程项目总进度目标论证的说法，正确的是（ ）。2014",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设工程项目总进度目标指的是整个工程项目的施工进度目标",false,{"key":16,"text":17,"correct":18},"B","建设工程项目总进度目标的论证应分析项目实施阶段各项工作的进度和关系",true,{"key":20,"text":21,"correct":14},"C","大型建设工程项目总进度目标论证的核心工作是编制项目进度计划",{"key":23,"text":24,"correct":14},"D","建设工程项目总进度纲要应包含各子系统中的单项工程进度规划","建设工程项目总进度目标论证应分析和论证项目实施阶段各项工作的进度，以及项目实施阶段各项工作进展的相互关系。参见教材26。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]