[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141153":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1141153,799,2,"多选题","在建设工程项目进度计划系统中，按计划的深度不同划分的进度计划包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","总进度规划",true,{"key":16,"text":17,"correct":18},"B","设计进度计划",false,{"key":20,"text":21,"correct":14},"C","项目子系统进度计划",{"key":23,"text":24,"correct":18},"D","施工进度计划",{"key":26,"text":27,"correct":18},"E","业主方项目实施进行计划","AC","本题主要考查建设工程项目进度计划系统的划分。 进度计划系统按不同深度划分，包括总进度规划（计划）、项目子系统进度规划（计划）、项目子系统中的单项工程进度计划系统。 综上所述，本题正确答案为AC项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]