[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141140":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1141140,799,1,"单选题","建设工程施工进度控制中，业主方的任务是控制整个项目（ ）的进度。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","实施阶段",true,{"key":16,"text":17,"correct":18},"B","决策阶段",false,{"key":20,"text":21,"correct":18},"C","项目全寿命周期",{"key":23,"text":24,"correct":18},"D","使用阶段","本题主要考查了项目进度控制的任务。 业主进度控制的任务是控制整个项目实施阶段的进度，包括控制设计准备阶段的工作进度、设计工作进度、施工进度、物资采购工作进度，以及项目动用前施工准备阶段的工作进度。 综上所述，本题正确答案为A。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]