[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1141066":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1141066,799,1,"单选题","工程成本应当包括（）所发生的，与执行合同有关的直接费用和间接费用。2018真题",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","从工程投标开始至竣工验收为止",false,{"key":16,"text":17,"correct":14},"B","从场地移交开始至项目移交为止",{"key":19,"text":20,"correct":21},"C","从合同签订开始至合同完成为止",true,{"key":23,"text":24,"correct":14},"D","从项目设计开始至竣工投产为止","本题考查的是成本核算的范围。根据《企业会计准则第15号—建造合同》，工程成本包括从建造合同签订开始至合同完成止所发生的、与执行合同有关的直接费用和间接费用。参见教材02。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]