[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140890":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140890,799,2,"多选题","建设工程项目施工成本由直接成本和间接成本所组成，其中直接成本主要有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","差旅交通费",false,{"key":16,"text":17,"correct":18},"B","施工机具使用费",true,{"key":20,"text":21,"correct":18},"C","材料费",{"key":23,"text":24,"correct":18},"D","人工费",{"key":26,"text":27,"correct":14},"E","管理人员工资","BCD","直接成本主要有人工费、材料费、施工机具使用费。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]