[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140880":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1140880,799,1,"单选题","建设工程项目施工成本控制包括若干环节，其中最具实质性的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","纠偏",true,{"key":16,"text":17,"correct":18},"B","分析",false,{"key":20,"text":21,"correct":18},"C","比较",{"key":23,"text":24,"correct":18},"D","检查","本题主要考查建设工程项目施工成本控制的环节。 建设工程项目施工成本控制包括比较、分析、预测、纠偏、检查等环节，在比较的基础上分析偏差的严重性和偏差产生的原因，从而采取适当的纠偏措施是施工成本控制工作的核心。所以施工成本控制最具实质性的是纠偏环节。 综上所述，本题正确选项为A项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]