[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140862":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1140862,799,1,"单选题","作为工程项目建设的参与方之一，供货方的项目管理工作主要是在（ ）进行。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计阶段",false,{"key":16,"text":17,"correct":18},"B","施工阶段",true,{"key":20,"text":21,"correct":14},"C","保修阶段",{"key":23,"text":24,"correct":14},"D","动用前准备阶段","供货方的项目管理工作主要在施工阶段进行，但它也涉及设计准备阶段、设计阶段、动用前准备阶段和保修期。考 点:供货方项目管理的目标和任务。@##",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]