[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140861":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140861,799,2,"多选题","设计方的项目管理工作主要在建设工程项目设计阶段进行，但也会涉及（ ）等阶段。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","决策",false,{"key":16,"text":17,"correct":18},"B","施工",true,{"key":20,"text":21,"correct":18},"C","动用前准备",{"key":23,"text":24,"correct":18},"D","保修",{"key":26,"text":27,"correct":14},"E","运营","BCD","本题主要考查设计方的项目管理工作。 设计方的项目管理工作的目标和任务如图所示： 设计方的项目管理工作主要在设计阶段，但也涉及设计前的准备阶段、施工阶段、动用前的准备阶段、保修期。 综上所述，本题正确选项是BCD项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]