[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140858":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140858,799,2,"多选题","在建设工程项目各参与单位中，需对项目总投资或总造价进行目标管理的单位有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","业主方",true,{"key":16,"text":17,"correct":14},"B","设计方",{"key":19,"text":20,"correct":21},"C","施工方",false,{"key":23,"text":24,"correct":21},"D","供货方",{"key":26,"text":27,"correct":14},"E","项目总承包方","ABE","本题主要考查目标管理的主体。 ABE项：在项目管理的各方中需对项目总投资或总造价进行目标管理的单位有业主方、设计方、项目总承包方。所以ABE项正确。 C项：施工方应进行施工目标管理，而非项目总投资或总造价目标管理。所以C项错误。 D项：供货方不进行项目总投资或总造价目标管理，所以D项错误。 综上所述，本题正确答案是ABE项。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]