[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140830":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1140830,799,1,"单选题","按国际工程惯例，当采用指定分包商时，应对分包合同规定的工期和质量目标向业主负责的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","业主",false,{"key":16,"text":17,"correct":14},"B","监理方",{"key":19,"text":20,"correct":14},"C","指定分包商",{"key":22,"text":23,"correct":24},"D","施工总承包管理方",true,"本题主要考查施工方项目管理的目标。 按国际工程的惯例，当采用指定分包商时，不论指定分包商与施工总承包方，或与施工总承包管理方，或与业主方签订合同，由于指定分包商合同在签约前必须得到施工总承包方或施工总承包管理方的认可，因此，施工总承包方或施工总承包管理方应对合同规定的工期目标和质量目标负责。 综上所述，本题正确答案为D。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]