[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140776":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1140776,799,1,"单选题","根据《建设工程项目管理规范》GB\u002FT50326-2006条文风险等级划分，下图中风险区A的风险等级为（ ）。2017",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","5",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","1","",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]