[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140775":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1140775,799,1,"单选题","根据《建设工程项目管理规范》（GB\u002FT50326—2006）条文中的风险等级评价估表，如果某个风险事件将对项目造成中度损失，且发生的可能性很大。则该事件的风险等级为（ ）级。( 2015真题 )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",false,{"key":16,"text":17,"correct":18},"B","4",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","2","",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]