[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140760":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1140760,799,1,"单选题","下列选项中，不是编制项目管理目标责任书依据的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目合同文件",false,{"key":16,"text":17,"correct":18},"B","项目管理实施规划",true,{"key":20,"text":21,"correct":14},"C","组织的管理制度",{"key":23,"text":24,"correct":14},"D","组织的经营方针和目标","本题主要考查项目管理目标责任书的编制依据。 编制项目管理目标责任书应依据下列资料： （1）项目合同文件。 （2）组织的管理制度。 （3）项目管理规划大纲。 （4）组织的经营方针和目标。 本题为选非题，综上所述，本题正确选项为B项。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]