[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140695":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140695,799,2,"多选题","在施工过程中投资的计划值和实际值的比较包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工程合同价与工程概算",true,{"key":16,"text":17,"correct":14},"B","工程合同价与工程款的支付",{"key":19,"text":20,"correct":14},"C","工程决算与工程预算",{"key":22,"text":23,"correct":14},"D","工程决算与工程合同价",{"key":25,"text":26,"correct":27},"E","工程预算与工程概算",false,"ABCD","本题主要考查投资的计划值和实际值的比较。 投资的计划值和实际值的比较如下表所示： 综上所述，本题正确选项为ABCD项。@jin",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]