[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140694":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140694,799,2,"多选题","应用动态控制原理进行建设工程项目投资控制时，相对于工程合同价而言，投资的计划值有（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","投资规划",true,{"key":16,"text":17,"correct":14},"B","工程概算",{"key":19,"text":20,"correct":14},"C","工程预算",{"key":22,"text":23,"correct":24},"D","工程进度款",false,{"key":26,"text":27,"correct":24},"E","工程决算","ABC","@jin",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]