[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140685":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1140685,799,1,"单选题","在某大型工程项目的实施过程中，由于“下情不能上传，上情不能下达”，导致项目经理不能及时作出正确决策，拖延了工期。为了加快实施进度，项目经理修正了信息传递工作流程。这种纠偏措施属于动态控制的（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术措施",false,{"key":16,"text":17,"correct":14},"B","管理措施",{"key":19,"text":20,"correct":14},"C","经济措施",{"key":22,"text":23,"correct":24},"D","组织措施",true,"编制信息传递工作流程属于组织措施。##@",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]