[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140663":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140663,799,2,"多选题","根据《建筑施工组织设计规范》（GB\u002FT50502-2009），以分部（分项）工程或专项工程为主要对象编制的施工方案，其主要内容包括（ ）。2014",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程概况",true,{"key":16,"text":17,"correct":18},"B","施工部署",false,{"key":20,"text":21,"correct":14},"C","施工方法和工艺要求",{"key":23,"text":24,"correct":14},"D","施工准备与资源配置计划",{"key":26,"text":27,"correct":18},"E","施工现场平面布置","ACD","本题考查的是在该规范中规定施工方案的主要内容：工程概况；施工安排；施工进度计划；施工准备与资源配置计划；施工方法及工艺要求。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]