[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140604":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140604,799,2,"多选题","在国际上，工程建设物资采购的常用模式有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","业主方自行采购",true,{"key":16,"text":17,"correct":18},"B","行政制定采购",false,{"key":20,"text":21,"correct":14},"C","承包商采购",{"key":23,"text":24,"correct":14},"D","与承包商约定制定供应商采购",{"key":26,"text":27,"correct":18},"E","行业协会统一采购","ACD","本题主要考查工程建设物资采购模式。 工程建设物资指的是建筑材料、建筑构配件和设备。在国际上业主方工程建设物资采购的常用模式有：（1）业主方自行采购；（2）与承包商约定某些物资为指定供货商；（3）承包商采购。@##",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]