[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140532":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1140532,799,1,"单选题","下列项目策划工作中，属于实施阶段管理策划的是（ ）。2014",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目实施各阶段项目管理的工作内容策划",true,{"key":16,"text":17,"correct":18},"B","项目实施期管理总体方案策划",false,{"key":20,"text":21,"correct":18},"C","生产运营期设施管理总体方案策划",{"key":23,"text":24,"correct":18},"D","生产运营期经营管理总体方案策划","本题考查的是项目实施的管理策划主要工作内容。项目实施的管理策划其主要工作内容包括：（1）项目实施各阶段项目管理的工作内容；（2）项目风险管理与工程保险方案。",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]