[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140409":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1140409,799,2,"多选题","建设工程决策阶段项目管理工作的内容有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","确定和落实建设地点",true,{"key":16,"text":17,"correct":14},"B","确定建设项目的投资目标、进度目标和质量目标",{"key":19,"text":20,"correct":21},"C","编制施工组织设计",false,{"key":23,"text":24,"correct":14},"D","确定建设任务和建设原则",{"key":26,"text":27,"correct":14},"E","确定和落实项目建设的资金","ABDE","本题主要考查建设工程项目决策阶段相关内容。 决策阶段管理工作的主要任务是确定项目的定义，一般包括如下内容：确定项目实施的组织、确定和落实建设地点、确定建设任务和建设原则、确定和落实项目建设的资金、确定建设项目的投资目标、进度目标和质量目标等。 综上所述，本题正确答案为ABDE。",{"id":6,"name":31,"category":32,"favorite":33},"一建建设工程项目管理","建筑工程",0]