[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1140406":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1140406,799,1,"单选题","建设工程项目管理的时间范畴是建设工程项目的（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工阶段",false,{"key":16,"text":17,"correct":14},"B","设计准备阶段、设计阶段、施工阶段、保修阶段",{"key":19,"text":20,"correct":14},"C","决策阶段和实施阶段",{"key":22,"text":23,"correct":24},"D","实施阶段",true,"本题主要考查项目管理的目标和任务。 项目的实施阶段包括设计前的准备阶段、设计阶段、施工阶段、动用前的准备阶段和保修期，项目实施阶段管理的主要任务是通过管理使项目的目标得以实现。建设工程项目管理的时间范畴是建设工程项目的实施阶段。 综上所述，本题正确答案为D。 *",{"id":6,"name":27,"category":28,"favorite":29},"一建建设工程项目管理","建筑工程",0]